Monday, March 13, 2017

John William 37VT68: Running AC ducting

From John Mackie


The AC duct is going from under liquor cabinet to fwd port corner of galley under the corner cabinet. I had to remove the stove, the stainless heat shield and the gasket material underneath and then cut out the plywood bottom of the stove cubby hole.  I made a template for my trim router to cut a 7 in hole for the insulated hose and screwed it to the bulkheads to gain access to the unused storage areas. These needed to be close to the hull to allow room for the 30 in the drawer under the stove. 

As you can see from the pictures big people shouldn't own small boats. It took 6 hrs to remove everything and 30 minutes to cut the 2 holes, 5 ft arms would really help. Tomorrow if I can move I will start putting everything back again and then I can start on the hose running aft.















Sent from my iPhone

No comments:

Post a Comment