From: Randy Miller <rfmillerdesign@gmail.com>
Date: December 20, 2017 14:43:10
Our major electrical project is finally complete and operational. It started with removing the last bit of 35 year old copper wire (AC & DC) from the shore power inlet to the main fuse panel breakers. The entire main fuse panel wiring was gutted, circuits reorganized, labeled and re-wired (both AC & DC). I designed a new fuse panel using pre-wired Blue Sea circuit breaker panels which just fit in the existing space. A (#8101) ELCI 120V Distribution Panel unit was installed along with three (#80230 12V DC (8 position) Distribution Panel units plus new analog meters. Date: December 20, 2017 14:43:10
A new shore power Smart Plug was installed along with cleaning up the AC distribution terminal block (re-wiring and labeling).
Then I focused on untangling and diagramming the AC side with the help of my ABYC electrician. Starting from the shore power inlet to the AC distribution panel and on to the main back panel, everything was cleaned up, re-organized, new wire run and labeled.
With all the various color code systems for DC (White & Blk, Brn & Yellow, Red & Blk) and then (Blk & White) for AC, I found it best to focus on one side at a time…..Far less chance off error and big sparks. I basically gutted all the DC wires except for a few necessary circuits labeling everything first.
What an improvement! (Working modular breakers positioned to ones liking, working lights, backlit meters, backlit nomenclature and custom label names). Really nice!
We are back up running again and ready to head out for a New Years cruise.
Randy & Yvonne
No comments:
Post a Comment